top of page

In 1999 Gulfpoint Construction facilitated the building of Lake-Sumter's baseball and softball fields. The fields needed to be ready for the opening day of the season in the spring of 2000.

 

Both fields were built from the ground up. Both baseball and softball fields have a  press box and batting cages. The batting cages have a metal building over the top of the cages. 

8 Acres | 04.2000

LAKE-SUMTER SECTION